METHODOLOGICAL BASIS FOR ESTIMATING THE LIFE CYCLE COST OF AIRCRAFT ENGINE, TAKING INTO ACCOUNT THE ATTENDANT RISKS
https://doi.org/10.26425/1816-4277-2020-1-121-128
Abstract
About the Authors
E. A. OzdoevaRussian Federation
Ozdoeva Elza Postgraduate student
Moscow
O. A. Smolyakov
Russian Federation
Smolyakov Oleg Postgraduate student
Moscow
References
1. Gracheva M. V., Sekerin A. B., Afanas’ev A. M. Risk-menedzhment investitsionnogo proekta [Risk-menedzhment investment project], Moscow, Yuniti-Dana, 2009, 544 p.
2. Grigor’ev V. A. et al. Vybor parametrov i termogazodinamicheskie raschety aviatsionnykh gazoturbinnykh dvigatelei [The choice parameters and thermogasdynamic aviation engines calculations: Mannual], Samara: SGAU, 2009, 202 p.
3. Klochkov V. V. Upravlenie innovatsionnym razvitiem grazhdanskogo aviastroeniya: monografiya [Control innovative development of civil aircraft industry: monography], Moscow, MGUL, 2009, 280 p.
4. Kostromina E. V. Opredelenie sebestoimosti aviaperevozok v RF i za rubezhom [Determination of the cost of air travel in Russia and abroad], Moscow, MGTU GA, 2003, 234 p.
5. Timofeeva T. B., Ozdoeva E. A. Kachestvennyi analiz riskov investitsionnogo proekta [Qualitative risk analysis of investment project], Aktual`nye problemy upravleniya – 2016: materialy 21-i Mezhdunarodnoi nauchno-prakticheskoi konferentsii. Moskva, 23-24 noyab. 2016 g. [Сurrent Management Issues – 2016: Proceedings of the 21st International Scientific and Practical Conference, Moscow, November 23-24, 2016], Moscow, GUU, 2016, Pp. 96-98.
Review
For citations:
Ozdoeva E.A., Smolyakov O.A. METHODOLOGICAL BASIS FOR ESTIMATING THE LIFE CYCLE COST OF AIRCRAFT ENGINE, TAKING INTO ACCOUNT THE ATTENDANT RISKS. Vestnik Universiteta. 2020;(1):121-128. (In Russ.) https://doi.org/10.26425/1816-4277-2020-1-121-128